Founder & Strategic Leader
Born in Eskişehir in 1983, İsa Özinan is married with three children. He graduated from Gazi University, Department of Mechanical Engineering, in 2005, and completed the TOBB University Mini MBA (2020) and Nişantaşı University MBA (2024) programs.
More than 12 years of his professional career were spent abroad (the Netherlands, Denmark, France, Germany, Saudi Arabia, Qatar, Oman, Russia, Libya, etc.) at global companies, in senior positions and actively in the field at corporations such as Symmetric Holding, Eurasia Tunnel, GWS, Çimsa, ENKA and Bechtel.
Over a professional career spanning more than 25 years, he has held senior management roles across the energy, construction, software, hospitality and manufacturing sectors; specialized in strategic leadership, operational excellence and project management; and managed multimillion-dollar portfolios in national and international projects.
Over USD 1 million in annual savings through process optimizations at the Eurasia Tunnel; a 41% improvement in operation times; employee satisfaction raised from 30% to 57%.
In the wind sector, profitability was raised from 8% to 42% through operational sales and planning.
Coordinated multi-sector projects at Symmetric Holding.
The Çimsa Afyon Cement plant investment was completed USD 24M under budget and 5 months 10 days ahead of schedule.
Budget advantages and early deliveries through effective management on ENKA Construction projects.
At a Denmark-based company, capacity was scaled from 1 to 7 and 7 projects were completed simultaneously.
The only project delivered with zero defects across the construction of 22 stations.
Successful evacuation of 400 Turkish workers from the Ubari Thermal Power Plant in Libya.
AI-assisted software for explosion-proof (Ex-proof) panels: it calculates the heat load of the selected internal equipment, selects the enclosure automatically, and produces the 3D drawing, a manufacturing-ready design and the single-line diagram.
A digital consulting web application that keeps national economic data up to date in its database and runs 360° Check-Ups from strategy to finance and advanced financial analyses, producing reports from academic data in the database without inventing figures.
Motorcycle selection for a firefighting system with a 40-litre AFFF tank, integration of the system onto the motorcycle and hands-on test rides. Discharge time was extended to 120 seconds, allowing three times longer intervention than the previous system in tunnel vehicle fires.
A system design that quickly rights an overturned vehicle on the spot, without a crane, using slings and a push bar within a 2.80 m clearance.