Manufacturing module

From order to actual cost: bills of materials, MRP, work orders and the shop floor in one flow

Sales orders and forecasts say what to produce; MRP calculates what to buy and when; operators report what happens on the shop floor from a tablet; and cost is determined by the materials and time actually used.

Bill of materials (BOM)Routings and work centresMRPWork ordersShop-floor terminalDowntime reportProduction cost

What does the PillarRise production tracking software do?

The PillarRise Manufacturing module manages multi-level, versioned bills of materials, routing and work centre cards, material requirements planning (MRP), work orders and the shop-floor terminal in a single flow. MRP deducts stock, open sales orders, open work orders and pending purchases to suggest what to produce and what to buy. Operators start jobs and report downtime and scrap from a tablet; material consumption and finished goods receipts are posted automatically. Production cost is calculated not from the plan but from the materials, labour and manufacturing overhead actually incurred.

Flow

Six steps of production, one record

Demand

Sales orders and planned requisitions uploaded from Excel.

MRP

Net requirements; make-or-buy suggestions.

Work orders

The bill of materials and routing are copied to the work order.

Shop floor

Operators start jobs from a tablet and report downtime and scrap.

Finished goods receipt

At the last operation, consumption and finished goods are posted to inventory.

Cost

Actual cost is finalised at closing.

Material requirements planning (MRP)

What to produce, what to buy, and when? The software calculates

Explodes sales orders and planned requisitions through the bill of materials, deducting stock on hand and purchases in transit.

  • Stock, open orders, open work orders, purchase requisitions and purchase orders are taken into account
  • Semi-finished goods are exploded level by level; the suggestion at one level becomes the requirement at the next
  • Minimum-maximum stock, minimum order quantity, order multiples and lead time
  • Latest order and start dates
  • One-click draft work orders or purchase requisitions from selected suggestions
  • Expired batches are not counted as stock on hand

Material Requirements Planning and planned requisitions: from order to work order · with Turkish subtitles

Shop floor

What happens on the shop floor is recorded as it happens

A line terminal on a tablet; operators work with a PIN without logging into the ERP.

  • Operators start a job, report downtime and scrap with a reason, and finish the operation
  • At the last operation, material consumption and finished goods receipt are posted automatically
  • Actual times are written to the operation, and cost is calculated from those times
  • Line Board: real-time status of work centres and the day's counters
  • Downtime Report: downtime by day, work centre and reason
  • Prolonged unplanned downtime is reported to the person responsible

Shop-Floor Terminals and Line Board: reporting production from a tablet · with Turkish subtitles

Bills of materials and routings

How a product is made, in one place, with its version

Multi-level bill of materials

Semi-finished goods are exploded automatically

  • Batch output does not have to be 1 (e.g. 1 batch = 500 units)
  • Subcontracted labour becomes a component through a service card
  • See on one screen which finished products use a given raw material
Scrap

With the right formula

  • Scrap is calculated as a divisor: gross = net ÷ (1 − scrap)
  • For 5% scrap, 100 kg net is 105.263 kg gross; stock counts do not come up short
Versions and locking

Approved bills of materials do not change

  • A change creates a new version; when the new one is approved, the old one is deactivated
  • An old version can be reactivated if needed
  • Circular bills of materials (A → B → A) are not accepted
Routings and work centres

Machine and manual labour work centres

  • Operation times and hourly rates
  • Suggested manufacturing overhead hourly rate from maintenance and energy records
  • Routings are versioned together with the bill of materials
Cost simulation

Before you produce

  • Material requirements and estimated cost for a given production quantity
  • Components with unknown cost are not counted as zero; they are flagged
Quality link

Problems are recorded at the source

  • If the Quality module is active, a nonconformity can be raised from the work order
  • Root cause and action tracking
Work orders and cost

Cost from actuals, not estimates

Work orders

Copies the bill of materials

  • Written with the bill of materials and routing versions in force when it was opened; later changes to the bill of materials do not affect open work orders
  • Opened from sales orders; double planning is prevented
  • Production status and due-date delays are visible on the order
Consumption and finished goods receipt

No silent errors

  • Finished goods receipts without consumption are rejected: zero-cost products never enter inventory
  • For batch-tracked products, the batch is created with the work order number
  • Expired batches are not consumed; FIFO
Actual cost

Finalised at closing

  • Pool: actual consumption + labour + manufacturing overhead, divided by the quantity produced
  • At closing, the finished goods cost and the cost of subsequent sales are adjusted
  • Plan-versus-actual variance and Production Cost Report
Why it matters

Production becomes visible, cost becomes known

A common problem for manufacturersWith PillarRise Manufacturing
Materials turn out to be short just as production startsMRP tells you the net requirement and the latest order date in advance.
What happened on the shop floor is only known at the end of the dayOperators report from a tablet; the Line Board is live.
Nobody knows why downtime happensThe Downtime Report breaks down duration by work centre and reason.
The real cost of a product is unknown, and prices are set by guessworkUnit cost calculated from actual consumption, time and overhead.
When a bill of materials changes, the cost of past production changes tooApproved bills of materials are locked; a change creates a new version.
Implementation

Production on record in four steps

Cards and work centres

Raw material, semi-finished and finished product cards; work centres and machines with hourly rates.

Bills of materials and routings

We start with a few main products and approve the bills of materials.

Trial production

We test MRP, work orders and the terminal end to end with a real order.

Go-live and analysis

We go live and read the first month's cost and downtime reports together.

Frequently asked questions

Frequently asked questions about the Manufacturing module

What does MRP need?

Approved bills of materials and planning data on the cards: lead time, minimum and maximum stock, minimum order quantity and order multiples. If these fields are empty, MRP still runs and suggestions are based on requirements only.

We do not manufacture. Is MRP still useful?

Yes. For companies without the Manufacturing module, the same calculation runs on the Purchasing screen as purchase suggestions.

Does the shop-floor terminal need special hardware?

No. The terminal opens in a browser; a tablet or touchscreen is enough. Each terminal counts as one Manufacturing user.

Can operators log into the ERP?

No. Operators log into the terminal with a PIN and see only the work orders at their own work centre.

Can data be collected automatically from machines?

Today, production, downtime and scrap are recorded through the operator's terminal reports. Let's discuss your needs for direct machine data in the demo.

Are subcontracting and batch production supported?

Yes. Subcontracted labour becomes a bill-of-materials component through a service card; for batch-tracked products, the batch is created with the work order number and expiry dates are tracked.

Put your production on record

In a 30-minute online demo, we show MRP, work orders and the shop-floor terminal using an example similar to your product.

Request a demo

Related pages: Inventory · Purchasing · Quality Management

WhatsApp
PositiveSSL güvenli site