Sales orders and forecasts say what to produce; MRP calculates what to buy and when; operators report what happens on the shop floor from a tablet; and cost is determined by the materials and time actually used.
The PillarRise Manufacturing module manages multi-level, versioned bills of materials, routing and work centre cards, material requirements planning (MRP), work orders and the shop-floor terminal in a single flow. MRP deducts stock, open sales orders, open work orders and pending purchases to suggest what to produce and what to buy. Operators start jobs and report downtime and scrap from a tablet; material consumption and finished goods receipts are posted automatically. Production cost is calculated not from the plan but from the materials, labour and manufacturing overhead actually incurred.
Sales orders and planned requisitions uploaded from Excel.
Net requirements; make-or-buy suggestions.
The bill of materials and routing are copied to the work order.
Operators start jobs from a tablet and report downtime and scrap.
At the last operation, consumption and finished goods are posted to inventory.
Actual cost is finalised at closing.
Explodes sales orders and planned requisitions through the bill of materials, deducting stock on hand and purchases in transit.
Material Requirements Planning and planned requisitions: from order to work order · with Turkish subtitles
A line terminal on a tablet; operators work with a PIN without logging into the ERP.
Shop-Floor Terminals and Line Board: reporting production from a tablet · with Turkish subtitles
| A common problem for manufacturers | With PillarRise Manufacturing |
|---|---|
| Materials turn out to be short just as production starts | MRP tells you the net requirement and the latest order date in advance. |
| What happened on the shop floor is only known at the end of the day | Operators report from a tablet; the Line Board is live. |
| Nobody knows why downtime happens | The Downtime Report breaks down duration by work centre and reason. |
| The real cost of a product is unknown, and prices are set by guesswork | Unit cost calculated from actual consumption, time and overhead. |
| When a bill of materials changes, the cost of past production changes too | Approved bills of materials are locked; a change creates a new version. |
Raw material, semi-finished and finished product cards; work centres and machines with hourly rates.
We start with a few main products and approve the bills of materials.
We test MRP, work orders and the terminal end to end with a real order.
We go live and read the first month's cost and downtime reports together.
Approved bills of materials and planning data on the cards: lead time, minimum and maximum stock, minimum order quantity and order multiples. If these fields are empty, MRP still runs and suggestions are based on requirements only.
Yes. For companies without the Manufacturing module, the same calculation runs on the Purchasing screen as purchase suggestions.
No. The terminal opens in a browser; a tablet or touchscreen is enough. Each terminal counts as one Manufacturing user.
No. Operators log into the terminal with a PIN and see only the work orders at their own work centre.
Today, production, downtime and scrap are recorded through the operator's terminal reports. Let's discuss your needs for direct machine data in the demo.
Yes. Subcontracted labour becomes a bill-of-materials component through a service card; for batch-tracked products, the batch is created with the work order number and expiry dates are tracked.
In a 30-minute online demo, we show MRP, work orders and the shop-floor terminal using an example similar to your product.